Shiv Orchid Flats

  1. Home
  2. Project
  3. Shiv Orchid Flats

About the project

Project Date:

2024

System Capacity:

150 kW

Category:

Residential Solar

Client

Shree Orchid Co-op Hou. Service Soc. Ltd

Project Location:

Surendranagar, Gujarat

Project Information

Solar Ace Energy proudly completed a landmark 150 kW residential solar installation for Shree Orchid Co-operative Housing Society in Surendranagar. Designed to power both individual homes and shared society facilities, this high-capacity system reflects a growing trend of energy self-reliance in urban residential communities.

Scope of Project

  • Clean Energy Output: The 150 kW system produces approx. 219,000 kWh annually, supplying sustainable power to over 60 households and all shared utilities.

  • Massive Cost Savings: Combined annual savings of over ₹13 lakhs, significantly reducing monthly maintenance bills and personal electricity charges.

  • Environmental Impact: Reduces 195+ metric tons of CO₂ emissions annually, equivalent to removing 85 petrol vehicles from the road or planting 800+ trees every year.

  • Long-Term Durability: Built with premium monocrystalline modules and inverter systems, offering 25+ years of energy security with minimal degradation.

  • Grid Autonomy: The project enables both individual homes and the society at large to reduce dependency on conventional energy sources.

  • Subsidy-Driven ROI: Benefited from both central and state rooftop solar subsidy programs—accelerating ROI to under 3.5 years for most participants.

Project Gallery