Panda Water

About the project

Project Date:

January , 2024

System Capacity:

50 kW

Category:

Commercial Solar

Client

Panda Water

Project Location:

Changodar, Gujarat

Project Information

In January 2024, Panda Water installed a 50kW solar power system at their facility in Changodar, marking a key step toward sustainability and reducing reliance on conventional energy sources. This installation showcases their commitment to environmental responsibility and cost-efficient energy management.

Scope of Project

  • Annual Energy Generation: The 50kW system produces around 73,000 kWh of clean energy annually, significantly cutting down on electricity costs.
  • Cost Savings: The system results in substantial reductions in electricity bills, offering long-term savings for the business.
  • Eco-Friendly Initiative: Panda Water is now offsetting approximately 67 metric tons of CO2 emissions annually, contributing to a cleaner, greener planet.
  • Low Maintenance: The solar panels ensure efficient energy production with minimal maintenance, providing reliable performance for 25+ years.
  • Energy Stability: The system enhances energy independence, offering protection against fluctuating electricity prices.

Project Gallery