GAMARA HILLS FLATS

  1. Home
  2. Project
  3. Gamara Hills Flats

About the project

Project Date:

August 2024

System Capacity:

90 kW

Category:

Residential Solar

Client

Gamara HIlls Flat

Project Location:

Surendranagar

Gamara Hill Flats- Surendranagar

Project Information

In August 2024, Solar Ace Energy commissioned a high-capacity 90 kW rooftop solar system for Gamara Hills Flats, a large-scale residential community in Surendranagar. This project aimed to significantly offset the society’s energy consumption from the grid and ensure long-term financial and environmental returns.

Scope of Project

  • Energy Output: This robust 90 kW system generates approximately 135,000 kWh of clean energy annually, powering elevators, water pumps, basement lighting, and other common utilities across the complex.

  • Massive Cost Savings: The installation results in over ₹6.2 lakhs in annual electricity bill savings for the society, significantly reducing shared maintenance costs.

  • Eco Impact: The project helps the community offset approximately 123 metric tons of CO₂ emissions per year, comparable to planting over 550 trees annually or eliminating 28+ petrol vehicles from the road.

  • Sustainable Design Life: Built with top-tier materials, the system is expected to run seamlessly for 25+ years, offering unmatched durability and ROI.

  • Energy Security: Residents now benefit from enhanced energy independence, insulating them from rising electricity tariffs and unpredictable grid outages.

  • Government Subsidy: With Solar Ace’s assistance, Gamara Hills Flats availed significant solar rooftop subsidies, accelerating payback and boosting financial viability.

Project Gallery