Gyscoal Alloys Limited

  1. Home
  2. Project
  3. Gyscoal Alloys Limited

About the project

Project Date:

May 2025

System Capacity:

35kW

Category:

Industrial Solar

Client

Gyscoal Alloys Limited

Project Location:

Ahmedabad

Project Information

Gyscoal Alloys Limited partnered with Solar Ace Energy to enhance energy efficiency and reduce operational electricity costs through the installation of a 35 kW industrial solar system at their facility in Ahmedabad. Commissioned in May 2025, the project was designed to support daily manufacturing operations while lowering dependence on grid electricity.

Scope of Project

  • Clean Energy Output:
    The 35 kW solar plant generates approximately 48,000–52,000 units of clean electricity annually, supporting production machinery, ventilation systems, lighting infrastructure, and office operations.

  • Significant Cost Savings:
    With the solar system in place, Gyscoal Alloys Limited saves ₹3–₹4 lakhs annually in electricity costs—helping stabilize energy expenses and improve operational margins.

  • Carbon Offset:
    The installation offsets 30–35 metric tons of CO₂ emissions every year, equivalent to planting 130+ trees or removing 5–6 cars from the road—contributing positively to environmental sustainability.

  • High Efficiency & Uptime:
    Installed with Tier-1 high-efficiency solar panels and dependable string inverters, the system delivers consistent performance with over 99% uptime, ensuring reliable power for industrial operations.

Project Gallery