Krupal Pathshala

  1. Home
  2. Project
  3. Krupal Pathshala

About the project

Project Date:

Feb 2024

System Capacity:

30kW

Category:

Commercial Solar

Client

Krupal Pathshala

Project Location:

Shivranjani Ahmedabad

Project Information

Krupal Pathshala partnered with Solar Ace Energy to reduce electricity expenses and promote sustainable campus operations by installing a 30 kW commercial solar system at their institution in Shivranjani, Ahmedabad. Commissioned in February 2024, the project was designed to support classroom facilities, administrative offices, lighting infrastructure, and digital learning equipment with clean, reliable solar power.

Scope of Project

  • Clean Energy Output:
    The 30 kW solar plant produces approximately 42,000–45,000 units of clean electricity per year, powering classrooms, computer labs, administrative offices, LED lighting networks, and essential school equipment.

  • Significant Cost Savings:
    With the system operational, Krupal Pathshala saves ₹2.5–₹3.5 lakhs annually on electricity expenses—allowing the school to reinvest savings into academic programs, facility improvements, and student resources.

  • Carbon Offset:
    The installation offsets 28–30 metric tons of CO₂ emissions annually, equivalent to planting 120+ trees or removing 5–6 cars from the road each year—supporting the institution’s environmental responsibility.

  • High Efficiency & Uptime:
    Built with Tier-1 high-efficiency modules and premium string inverters, the solar setup ensures >99% uptime, delivering stable and uninterrupted performance suited for commercial educational environments.

Project Gallery