Bhagwati Krushi Udhyog

  1. Home
  2. Project
  3. Bhagwati Krushi Udhyog

About the project

Project Date:

June 2023

System Capacity:

50kW

Category:

Industrial Solar

Client

Bhagwati Krushi Udhyog

Project Location:

Mansa Gandhinagar

Project Information

Bhagwati Krushi Udhyog partnered with Solar Ace Energy to integrate renewable energy into their agro-processing operations with a 50 kW industrial solar system, installed at their facility in Mansa, Gandhinagar. Commissioned in June 2023, the project was designed to reduce electricity expenses, enhance operational efficiency, and support the sustainability goals of the organization.

Scope of Project

  • Clean Energy Output:
    This 50 kW solar plant generates approximately 70,000–75,000 units of clean power annually, supporting agro-processing machinery, cooling systems, lighting, and administrative facilities at Bhagwati Krushi Udhyog.

  • Significant Cost Savings:
    The installation helps the company save ₹4–₹6 lakhs annually in electricity costs—improving operational margins and enabling reinvestment into production capacity and business growth.

  • Carbon Offset:
    The system offsets 45–50 metric tons of CO₂ emissions per year, equivalent to planting 190+ trees or removing 8–10 cars from circulation—enhancing the organization’s sustainability and compliance posture.

  • High Efficiency & Uptime:
    Built using Tier-1 solar modules and reliable string inverters, the system ensures strong generation with minimal downtime (<1%), delivering stable and dependable energy for agro-industrial operations.

Project Gallery